Solar Park, Kazakhstan 50MW
The chosen location is excellent for the PV project as it is in a remote area of the city with excellent road access and very close power connection point. Area is flat with even ground and no households or large trees nearby thus allowing optimal panel layout. Within the project is expected to install the most modern and efficient equipment to increase the power production and reduce losses. The project development is planned with, ABB, JA Solar, and EPC company Europower Energie.
Project stage: updating the technical design and approval process, ready-to-build stage 4-5 month from start of the financing.
Wind Park, Kazakhstan 108MW